Home  |  Site Search
  


Plunger Lift Calculations

Input Values

Pipe Diameter: 2-3/8" 2-7/8"
Well Depth: Feet
Daily Gas Production: MCF/day
Daily Liquid Production: BBL/day
Well Head or Line Pressure: PSIG
Liquid Lift Per Cycle: BBL.


Calculated Values

Gas Liquid Ratio: SCF/BBL
Average Casing Pressure Required: PSIG
Required Cycles: per day

PROBLEM: Required cycles greater than maximum.

Required Gas Volume Per Cycle: SFC/CYC
Daily Required Gas Volume: MCF/day

PROBLEM: Required gas volume greater than production.


Plunger Cycle Times

Fall Time: minutes
Rise Time: minutes
Total Cycle Time: minutes
Maximum Cycles: per day
2150 West 6th Avenue, Suite A
Broomfield, CO 80020
Phone: (303) 460-7481 or Toll Free (800) 460-7481
FAX: (303) 460-7486